skip to main content

Unit 9, SmartParc, Derby

A 430,000 sq ft frozen food production and logistics facility for Greggs

Hathaway were appointed to deliver the external envelope package for Unit 9 at SmartParc Derby, a 430,000 sq ft frozen food production and logistics facility for Greggs.

Designed to support Greggs’ continued UK expansion, the purpose-built facility combines advanced manufacturing, automated logistics and sustainable design. Hathaway supplied and installed high-performance Kingspan insulated roof and wall cladding systems, delivering a durable, thermally efficient external envelope to meet the demanding requirements of a modern food manufacturing environment.

The development forms part of the pioneering SmartParc Derby campus and incorporates a shared Energy Centre, rooftop photovoltaic panels, rainwater harvesting and EV charging infrastructure, supporting the site’s ambition to become one of the UK’s leading low-carbon food manufacturing hubs.

Client:
SEGRO
Architect:
Ashton Smith Architects
Contractor:
TSL
Completion:
2025

Project Highlights

• 430,000 sq ft frozen food production and logistics facility

• Kingspan KS1000RW QuadCore insulated composite roof system

• Kingspan KS1100CS QuadCore insulated wall cladding system

• Purpose-built facility supporting Greggs’ UK expansion

• Part of the pioneering SmartParc Derby low-carbon food manufacturing campus

 

Nfrc Gold
Achilles
Nzc
Nfrc
Spra
Citb
Investors In People
Safe Contractor
Bsi Logo
Constructionline